Khor Al-Mukalla - Phase Two
The project consists of a marine canal with two branches, a suspension bridge for cars with two lanes, one way and the other, instead of the Chinese bridge, a suspension bridge for cars towards the Munawwarah region, a network of lines, streets, new lanes, tunnels, and three suspended pedestrian bridges to connect the newly created areas in the second phase of Khor Al-Mukalla.
Al-Qabliyya Road - Phase One
The project is 160 km long and starts from the city of Mukalla, passing through the Jul Masha area to Douan. The road width is 12 m, of which 7 m is for the asphalt road and 5 m for the side shoulders. The project also includes the construction of 225 culverts and is considered a strategic and vital project that enhances the level of road infrastructure.
Rehab Al-Fardha Road
The project is 33,400 km long and is considered part of the old tribal road that connects Hadhramaut Valley to the city of Mukalla. The project consists of paving and asphalting the road, which contains many construction works such as rainwater drainage channels, retaining walls, and side protections for the road.